Project Reference

Wenyi West Road Extension — Phase II

Urban Road Tunnel · 4 Shield Drives

HomeReferencesWenyi West Road Extension — Phase II
01Reference I · Hangzhou, Zhejiang — China

Wenyi West Road Extension — Phase II

Urban Road Tunnel · 4 Shield Drives
CENTOR tail grease drums delivered to the Hangzhou Wenyi West Road Extension Phase II site
CENTOR supply on site
Aerial view of the shield launch shaft and segment yard, Wenyi West Road Extension Phase II
Launch shaft & segment yard

CENTOR provides tail sealant grease and a complete TBM lubrication package across four large-diameter shield drives on the second phase of the Wenyi West Road extension in Hangzhou. Machine diameters on the project range from 11.3 m to 14.5 m — placing these among the largest road-tunnel shields operating in eastern China — and the supply scope is structured to keep all four machines running at sustained advance rates without lubrication-related interruption.

Project Data
LocationHangzhou, Zhejiang Province, China
Project TypeUrban road tunnel — Phase II extension
TBM Diameter11.3 – 14.5 m
Tunnel Length≈ 4.175 km
Shield Drives4 machines
CENTOR ScopeTail grease · full TBM lubrication support
TBM Diameter
11.3 – 14.5 m
Large-diameter mixed shield fleet
Tunnel Length
4.175 km
Across 4 shield drives
CENTOR Scope
Tail Grease
Full TBM lubrication support
Scope of Supply

Tail sealant grease plus a complete lubrication support package for shield construction, specified to keep equipment operating reliably and efficiently throughout the drive.

Other References

Add Your Project to Our References

Contact us to discuss how CENTOR products and engineering support can be specified on your next underground project.